Vacuum solutions engineered for abatement & remediation
The trades where HEPA filtration isn't a preference — it's written into the rules. Work happens inside containment, waste leaves sealed and labeled, clearance decides when it's done, and every piece of equipment is specified with the governing jurisdiction's requirements in hand.
HEPA-Tested Filtration
The filtration class the rules name
Regulation-Aware
Asbestos, lead & RRP frameworks
Containment-Side Ready
Works inside the barriers
Sealed Waste Path
Bag-out discipline built in
Explosion-Proof
Manufacturing specialists
1000+
Vacuums sold worldwide
USA
Designed & manufactured
Direct
Buy from the manufacturer
NFPA 660
ATEX / IECEx principles
Abatement & Remediation production process explorer
Every stage. Every challenge. The right vacuum solution.
Abatement is a choreography of boundaries — build the containment, hold the pressure, remove the hazard, seal the waste, prove the clearance. Walk the stages to see where recovery equipment carries the work.
Stage 01 — Assessment & planning
Surveys identify the hazard, and the governing rules — federal, state, local — set the methods and the equipment requirements before anything is disturbed.
Key challenges
Where the rules name the equipment
HEPA Is Written In
The lead RRP rule explicitly requires HEPA vacuums; asbestos practice is built on them — the equipment class is named, not chosen.
Regulated Carcinogens
Asbestos is a Group 1 carcinogen with its own OSHA standards; lead carries its own — the work exists because the materials are this serious.
The Boundary Is Everything
Containment and negative pressure define the job — equipment that works inside the barriers without breaking them is the requirement.
Legacy Surprises
Older vermiculite insulation can carry asbestos contamination — the Libby legacy — so suspect materials are treated as such until tested.
Spores Are Particles Too
Mold remediation runs the same capture-and-contain logic — with the honest first step that the moisture source gets fixed or the mold returns.
Jurisdiction Rules Equipment
Abatement equipment must satisfy the governing rules where the job is — specify with those requirements in hand, always.
Dust & materials knowledge center
Know the hazard. Follow its rules.
Combustibility and severity are material- and particle-size-specific — testing and your Dust Hazard Analysis govern. Full directory: the full materials directory.
Applications in abatement work
- Factory housekeeping
- Machine cleaning
- Production line cleaning
- Preventive maintenance
- Shutdown cleaning
- Dust recovery
- Powder recovery
- Spill cleanup
- Silo cleaning
- View all
Built for performance. Built for compliance.
View all products →
HEPA Vacuums
99.99% filtration for fine and hazardous dust
Learn more
Industrial Vacuums
Continuous-duty recovery for demanding plants
Learn more
Pneumatic Vacuums
Air-operated — no electrical components
Learn more
Representative case study
Controlling Silica Sand & Reactive-Metal Dust in a Foundry
How a representative jobbing foundry runs housekeeping on the oldest dust hazard and the hottest floor at once — silica sand keyed to the exposure standards while shakeout concentrates the respirable fraction, and reactive-metal casting cells carry their own combustible-dust rules on the same shop floor.
Read the full case studyTalk to the manufacturer
Get the right explosion proof vacuum for your application.
Tell us what you need to vacuum and where. Our technical team will recommend the PrestiVac model best suited to your material, your classification and how hard you will work it — and because we build every unit ourselves, we can modify it to fit.
- Legally certified explosion proof
- Solid stainless steel construction
- Industry-best 3-year warranty
- Designed & manufactured in the USA
- 200+ vacuum versions
